![]() ![]() Mansycom successfully completed implementation of 5D BIM modeling at L& T DLF Cyber Park Project, Gurugram, using Trimble’s Vico Software in the year 2017. 403 MLD Surya Regional Bulk Water Supply Scheme, Thane, costing Rs 1,329.00 crores, of MMRDA under execution by L&T’s WET (Water & Effluent Treatment) IC (Independent Company), Chennai as an EPC contact, between Feb 2017 to Mar 2021. Implementation & maintenance support for Common Data Environment (CDE) on cloud & 5D BIM simulation using Trimble Vico Office Suite for the purposes of engineering coordination, construction time & cost control carried out satisfactorily for a period of 3 years for an infrastructure project i.e. Integration & coordination of engineering design of an industrial plant at Bawal, Rewari including of process plant facilities, achieved using 3D BIM technology for AECOM. It’s a tailored, yet expandable solution, packaged in a consistent and easy to use environment.Mansycom Consultants, the Lead Partner of M-N-E Consortium has successfully steered implementation of Integrated Project Monitoring Solution (IPMS) at DMRC’s Phase IV expansion & other upcoming metro projects, which has gone-live on April 23, 2021. Vico Office is structured in a modular way, allowing users to maximize efficiency and meet the needs of all construction process trades and phases. By creating a 5D BIM model which incorporates design, estimating data, and scheduling data, a live model is created that is dynamic and responds immediately to changes in the design and on site. Vico Office is designed as a tightly integrated, BIM-neutral platform to which multiple types of BIM models can be published, synthesized, and augmented with cost and schedule information. With Vico Office, building owners and general contractors can collaborate efficiently, manage costs, and optimize schedules on complex building projects. With Integrated Project Delivery and BIM technology becoming common buzz words, the necessity of a truly integrated social-BIM platform has become evident. ![]() ![]() An essential part of this change is the integration of processes and communication throughout the design-to-construction life cycle. With the increased demand for shorter delivery times, increased efficiency, and higher quality, owners and contractors are adopting new business models and technologies that will give them a competitive advantage. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. Archives
December 2022
Categories |